When it comes to PSA oxygen generator, you don’t just want deliveryyou need a team that handles everything, start to finish. That’s exactly what MeCanMed does. We manage the entire process, making sure your hospital oxygen generator is installed right, runs the way it 

should, and your staff knows how to use it. This isn’t just something we promise; it’s what we did recently for a hospital in Nigeria.


Step-by-step PSA oxygen generator setup video


Step 1: Getting Ready, Before Anything Arrives

Our work started long before the PSA oxygen generator lands. Once the client placed the order, we sent them a clear installation video and an easy-to-follow guide, complete with pictures. They would know exactly what needs to happen—power, space, ventilation, safety checks—so when our engineer showed up, the site was good to go.




Large wooden shipping crate containing PSA oxygen generator safely delivered


Step 2: Safe Delivery and Handover

We didn’t leave shipping to chance. Our customer service team made sure the equipment gets to the location safe and sound. When it arrived, our local engineer was there to meet it, handled the handover, and went through the delivery with the client right then and there. They saw everything as it came off the crate, so nothing was missed.



Engineer unpacked and inspected the PSA oxygen generator in the client’s presence


Step 3: Unpacking and Inspection


Right after delivery, our engineer unpacked the unit in the client’s presence. They peeled off the protective films and did a thorough check—both looks and function—to make sure nothing got damaged on the way. The client got to see every part up close before we started setting it up.


Professional engineer carefully connected the control panel


Step 4: System Setup and Connections

With everything unpacked and ready, our engineer started the PSA oxygen generator setup. They positioned the main unit, secured all the parts, and connected every cable and control panel by hand. Every connection got double-checked and tested. They made sure every detail was right before moving on to the next step.


Professional engineers performed connection and testing


Step 5: Full Integration and Double-Check

Next up, we integrated everything into the hospital oxygen generator. Whether it was hooking up to gas lines or power supplies, we followed the manufacturer’s specs and all safety protocols. Our technicians didn’t cut corners—every physical and electrical connection was checked, tightened, and tested.


Fully installed PSA oxygen generator


Step 6: Real Testing and Staff Training

Once fully integrated, our engineers ran the system through its paces, tested every function, and made sure it meets all standards. But they didn’t stop there. They trained the client’s staff—hands-on—so they knew how to use it, keep it running, and troubleshoot the basics. When we left, the staff felt ready.



What You Get: A Smooth, Documented Process  

We turn a complicated delivery into a hospital oxygen generator that’s ready to use. From the first email to the final handshake with our engineer, we handle it all. This Nigeria project aren’t just for showthey’re proof of our PSA oxygen generator setup process at work, every step of the way.